This will lead you to GeM website.
Some cases have been reported where bidders have claimed non receipt of prior intimation of RA start. In order to ensure that no prospective eligible bidder is left out due to non intimation on time, it has been decide that RA will henceforth start 24 hours after the buyer proceeds for the RA creation and initiated RA. RA Start date and End Date will be notified to both buyer and sellers.
GeM system maintenance activity is planned from 17/06/2023 9:00 PM until 18/06/2023 02:00 PM. While we will work towards avoiding any outages, the system may be unstable intermittently. As a preventive measure, you are requested to either prepone or postpone Bid related activities such as Bid creation, Evaluation, Seek Clarification, Reply Representation and Negotiations etc, to other dates as per your convenience. Also, you may like to avoid keeping Bid end date and Bid Opening dates on or near these dates if feasible.
Please find enclosed OM dated 28.04.2023 on revised format for Registration of bidders from countries sharing land border with India under Rule 144 (xi) for your kind information and necessary action.
Notification regarding Cyber Security Control matrix
Please note that insecure products, solutions, and services lead to exposure to threats and cyber security breaches which affects procuring entities. Assuring cyber security as a feature of products and services require ensuring cyber security compliances as a part of procurement This will also help in building a cyber-security culture. Building awareness in government agencies to adopt cyber security controls as part of the procurement of ICT products and services, as well as engaging industry to put cyber security control requirements into practise, is crucial for meeting the objective of ensuring cyber security.
It is noted that many times due to lack of awareness various clauses, provisions, and guidelines regarding cyber security requirements mandated by MeitY are not being incorporated while making procurements by buyer organisations. In order to give inputs to the procuring authorities regarding these aspects, Indian Computer Emergency Response Team (CERT-In) drafted a discussion paper regarding cyber security control matrix for the procurement of services and solutions by government organisations. The control matrix includes governance and policy, confidentiality, availability, regulatory complexity, audits and situational awareness, data security, application security, and network security. Discussion paper indicates the specification and requirements of different controls as well as indicative methods for verification for each control matrix. A copy of the discussion paper is enclosed herewith.
It may be noted that procuring entities may select and include appropriate and applicable controls from the control matrix indicated in the discussion paper as a part of their procurement of ICT services and solutions. Procuring entities may also consider adding additional specific controls as per their risk profile and scope of services.
It may also be noted that the adoption of cyber security controls by procuring entities in the procurement process may be kept voluntary (as best practises). However, after a year, based on the outcomes, learning control may be mandated as a part of all ICT-related procurement by government entities.
All buyer organization as well as seller/service providers are requested to note the above.
Push Button Procurement (PBP) functionality enhanced - No need for buyer to certify reasonableness of rates:
GeM has enhanced the Push button Procurement functionality enabled as per DoE OM number F.6/7/2022-PPD dated 11th January 2023. The new guidelines for PBP are as follow:
Please refer push button procurement Manual for detailed guidelines. The details of Categories enabled for PBP are available here.
Buyers are advised to comply the latest OM No.F.7/10/2021-PPD (1) dated 23.02.2023 issued by DoE for the restrictions under Rule 144(xi) of the General Financial Rules (GFRs), 2017 while procuring on GeM.
With reference to the clause 4, Section xiii, Sub-section 'm' of GeM GTC, it is to bring to your kind attention that the following categories of Sellers are exempted from furnishing Bid Security:
Note: No EMD to be taken from exempt category of sellers even by way of specific clauses mentioned in ATC / STC by the Buyers. Such clauses which are against the GeM GTC, will be treated as null and void.
Get immediate financing through TReDS to pay your MSMEs and show compliance with MSMED Act.
Benefits of TReDS:
How to avail benefits of TReDS?
Not registered with TReDS? Start registration NOW
With reference to the OM No.F.6/1/2023-PPD dated 06.01.2023, from Dept. of Expenditure, the minimum service charges for the commission based Manpower Outsourcing services has been revised to 3.85%. Procuring entities can also fix the service charges above 3.85% with proper justification on file, wherever required. However, such service charges should not exceed 7% in any case. It is also recommended to use the Least Cost Selection (LCS) especially in High Value Bids, the template for which can be assessed on this link.
DPIIT has issued OM P-45014/33/2021-BE-II (E-64737) dated December 20th, 2022 related to common examples of "Restrictive and discriminatory conditions against the local suppliers" and "Other conditions which make the bid non compliant to PPP-Mll Order''. Buyers are advised to comply with the same and ensure that their tenders are compliant with PPP-MII Order and don't include restrictive and discriminatory conditions against the local suppliers.
Single packet bid has been enabled on GeM and buyers can procure using it. In single packet bidding both technical and financial offerings are being opened simultaneously and buyers evaluate both financial and technical offers simultaneously and publish the evaluation results. Please refer to the user manual for details.
Additional disclaimer and recommendation for buyers for procurement of Drugs/Medicine through Custom/BOQ bids:
All Provisions of Drugs and Cosmetics Act, 1940 and Rules made there under as amended till date will always be applicable. This will include all notifications issued by Central Drugs Standard Control Organisation (CDSCO), Ministry of Health & Family Welfare (MoHFW) and Department of Pharmaceuticals (DOP), Ministry of Chemicals & Fertilizers from time to time in this regard.
The sellers are registered on GeM based on self-declaration of valid Drug License, product certification, test reports etc. However, buyers mandatorily check and validate the details at their end for all applicable licenses and certifications e.g., validity and authenticity/genuineness of drug license, product certification, manufacturer certification/licenses, test reports etc.
In case of custom/BOQ bid, it is recommended to take Notarized Undertaking from private drug manufacturers for necessary compliances. (attached format of "Notarized Undertaking")
Only manufacturers for particular drugs/medicine may be eligible to participate in the bid or quote for the drugs/medicine.
The service category “Healthcare Human Resource Outsourcing Service” has been merged with the other existing manpower outsourcing services which are Manpower Outsourcing Services - Minimum Wage and Manpower Outsourcing Services - Fixed Remuneration . Hence, it has been disabled from the market for all new bids. Buyers can hire the healthcare resources from these 2 manpower outsourcing service categories. There will be no impact on already published bids.
GeM has launched the Push button procurement functionality on experimental basis enabling buyer to buy upto 5 lakhs simplifying the procurement process and require minimal intervention from buyer. This is system driven procurement enabled for the limited 50 categories . This has been enabled vide DoE OM number F.6/7/2022-PPD dated 11th January 2023. The buyer may refer the push button procurement manual for further details. The details of categories enabled for PBP is available here. The key guidelines for PBP are as follow
Load Based Bidding
Bids are currently being evaluated on GeM based on the price quoted by the bidder at the time of bid participation. However, there are some use cases when the buyer publishes a bid and expects certain technical and commercial parameters to be used to evaluate the price, resulting in the evaluated price being different from the bidder's offered price.
To capture detailed technical and commercial parameters, GeM has added another feature whereby a buyer can declare the Technical and Commercial Loading Criteria for Bid Evaluation during Bid Creation itself, which will be printed for the bidders' reference in the Bid document.
The selection of the Techno Commercial for Bid Evaluation will be optional for the buyer and the same can be saved as "No," if buyer doesn’t wish to go with the same.
This will be used by the buyer for the limited categories available in the GeM marketplace.
Categories where Load based will be applicable - BIOMASS and types of pumps like HSD, Screw , Fuel, Petrol pump.
Bunching of predefined categories has been enabled now for bidding. Buyer can create bunch bid of items from same category. Buyer can also create bunch bid of items from different categories if such categories are enabled for bunching by GeM. If the item categories that you are trying to bunch are not enabled to be bunched together and you feel that these are items are having same Supplier / OEM base and are required to be bought together and bunching will not lead to restriction in competition, then you may please send an email request to GeM at request-bunch@gem.gov.in for enabling bunching of such categories. Please mention exact name of GeM categories that you are requesting for enabling bunching. Your request would be examined by GeM team and if it is found that such bunching would not lead to restrictive bidding, GeM would enable bunching of those categories. This is a one time exercise and once enabled, all buyers can bunch those categories in all their future bids. Custom and BoQ items are by default enabled to be bunched with other regular categories.
The option of acceptance/ rejection of Direct Purchase/ L1 orders will be discontinued on GeM from 29th July 22 onwards. All the orders placed on GeM shall be auto accepted unless the buyer is red flagged or the order is for a freight intensive item. Only in these cases, the sellers will get an option to Accept/ Reject the order. Even in these cases, the order shall be auto accepted in 5 days if no action is taken by the seller.
The functionality for the collection of interest amount on the delayed payments as per DoE OM No.F.6/18/2019-PPD dated 3rd July 2020 is being made live from 01st August 2022, which would be applicable on all CRAC issued/generated on or after 01st August 2022. If the payment is delayed beyond prescribed timelines, the buyer will be liable to deposit interest as per DoE OM. Interests due showing in the Buyer dashboards for older contracts are being reset to zero and all future interests would have to be paid using online functionality deployed on the GeM using the SBI payment gateway.
Please read DO from CEO GeM regarding misuse of Custom / BoQ based bids.
DP and L-1 purchase for multiple consignee is not allowed. Buyer can add multiple consignees during bid creation.
Bunching of the items has been disabled for Direct Purchase and L1 purchase. For ordering multiple items put the items in separate carts and proceed to checkout in each cart.
GeM is in process to phase out the use of OTP based on authentication process at various stages of procurement like bid floating, bid submissions, invoicing, CRAC generation, Bill process, payment etc. For seamless and hassle-free transition it is advised to get yourself registered for esign or DSC based authentication services and complete all associated formalities. The exact date of disablement of the OTP based authentication will be communicated in near future.
GeM is in a process of development of functionality to deal the statutory variations of contract like GST, VAT etc online. In meantime till such functionality is deployed buyers and sellers are advised to deal variation of taxes OFFLINE at their end with due verification and scrutiny as per enforced tax rates, contract clause and applicable guidelines of organization.
Direct RA is being disabled. Please use BID to RA in place of Direct RA.
Escalation of Tickets – Please raise a ticket while flagging any issue to GeM, it helps better tracking, monitoring, and faster resolution. Further it helps in escalating it to higher level if issue is not resolved within defined timeline. Now tickets can be escalated https://gem.gov.in/gemtickets/create to higher level.
Training for registration and bidding for buyers and sellers - GeM offers self-help trainings for buyers and sellers to register and procure services from the GeM portal without any external help. The link to access these training programs is https://gem.gov.in/training/training_module.
Input Tax Credit - Input Tax Credit and Reverse Charge Mechanism feature in BID has been implemented. Input Tax Credit is required by Buyers who are eligible for Input Tax Credit on GST and GST cess (wherever applicable) in their purchase. Since they get credit of GST therefore, they require financial evaluation of BID considering input tax credit (ITC) so that L1 evaluation is on Net landed Cost to the Buyer. There are three types of sellers in this case. One is regular GST registered seller, unregistered seller and seller registered under composition scheme. This functionality is for all goods and services except services on commission base.
Custom bid and BOQ Bid- GeM strongly recommend use of category based bids - Use of Custom Bid / BoQ bid is not allowed for items for which regular category is available on GeM. Buyer can use the features of Additional parameters also to suit its requirement. Any bid created under Custom / BoQ category shall be cancelled by GeM without any notice, if it is found that regular category is available on GeM for similar items.
Creation of secondary user under different primary user with same mail id: The secondary user registration using an existing email address should be allowed for all the roles - Buyer, Consignee and PAO/DDO.
GeM has revised its Transaction Charge policy. This can be accessed at here
Vaccines and Generic Drugs/Medicine categories - Categories of Vaccines required under the Universal Immunization Program (UIP) of MoHFW have been made live in consultation with them. The categories of TB medicines required under National TB program of MoHFW and other generic drugs/medicines have been made live.
Unlimited RA Auto Extensions - Now there is NO limit on number auto-extensions allowed in reverse auctions, GeM recommends use of unlimited auto extension for best price discovery.
Bid opening from 3 days instead of 10 days only for central Gov & Central CPSE buyers and not applicable on BOQ and custom bids.
BID Life cycle from system has been removed from the system for all types of bids/RA.
Technical evaluator: Evaluation can be based on Single/Multiple evaluator(s) or self, selection for Tender Committee (TC) option shall also be available
Re-blocking of funds - Buyers will now be able to block funds which they had not done at the time of order placement due to reasons like change of financial years etc.
New Functionalities on Services
L1 negotiation: Buyer now gets an option to negotiate with L1 discovered from the financial evaluation. In case service provider has uploaded the price breakup then service provider gets the option to upload revised price breakup after conducting their negotiations with the buyer.
MSE preference: If buyer has selected MSE preference in bid then buyer will get option to send price match request to MSE if Non MSE bidder is selected as L1 and MSE price quoted is within L1+X% (X as defined in bid) range. In case buyer has not opted for MSE preference then buyer needs to provide competent authority approval with detail of approving authority.
Minimum floor price: A new feature has made live to solve the above problem, minimum floor price feature is available for buyers to define the minimum floor price below which no service provider would be able to quote in bid. This feature will help buyers to get reasonable price offers in bids. This feature is available for all PSUs/CPSEs/State Buyers and MoD.
Online invoicing for services - In order to introduce end to end procurement on GeM Invoicing has been made live on GeM for service providers and buyers to streamline the complete process.
Invoice rejection by consignee - Once the invoice raised by service provider, consignee now has the feature to reject the invoice against some rejection reasons which will be visible to service provider. Based on the comments, service provider will be able to update the invoice and then submit again.
Provision to upload additional SLA and SOW and ATC - Buyer has provision to write or upload document files for all of above features which will further become part of bid document and contract document and service provider has to abide by that. The terms and condition, scope of work or SLA mentioned by buyer will supersede by default conditions mentioned in SLA of the service.
Price breakup - GeM has introduced the functionality where Buyer can request for Price Breakup, Format to be uploaded by buyer for the breakup of components on cost/price offered by Service Provider in the Bid. Format uploaded by buyer may be used by service provider as reference for providing financial breakup. L1 will be evaluated by system basis on lowest price offered. GeM restricts this document to be available only during financial evaluation step, buyer will be able to open this document after financial will be open.
Custom filter for buyer - GeM has introduced feature to choose “Others” option from the list of values of technical parameters in case desired parameter is not available. Buyer has to select “Intent of Buying” as “Bid” to enter the Customized Requirement.
GeM system maintenance activity is planned from 25/06/2022 9:00 PM until 26/06/2022 12:00 Noon. While we will work towards avoiding any outages, the system may be unstable intermittently. As a preventive measure, you are requested to either prepone or postpone Bid related activities such as Bid creation, Evaluation, Seek Clarification, Reply Representation and Negotiations etc, to other dates as per your convenience. Also, you may like to avoid keeping Bid end date and Bid Opening dates on or near these dates if feasible. Please note, during this period Buyers can access all previous and ongoing Bid/RA status and details from their panel.
Forward Auction is a new feature addition into GeM platform enabling integrated B2B (Business to Business) and B2C (Business to Customer) auction featuring pan India auctioneers and bidders. As a GeM registered buyer, user can create “Auction” to sell off goods/materials/immovable assets within GeM portal using Forward Auction application and can reach out pan India bidders at a larger scale. To know more, click here
Advanced Search- https://bidplus.gem.gov.in/advance-search
Please click here to view the service approval process flow.
"Buyer Selected Non-Golden Parameters are now mandatory Bid requirement” - Buyers can now choose both Golden and Non-Golden Parameters for defining the Bid Requirements. This will enable Buyers to impose a non-golden parameter as a mandatory specification for their Bids.
All Golden parameters of the category and only those non-Golden parameters which Buyer has selected while creating bid (with values as selected by the Buyer or better than that), will now form part of the overall item specifications in Bid and will be published in the Bid document. Please note that the Non-Golden Parameters which are not specifically selected by the Buyer will now be discarded from bid and will not be published in bid and Sellers can offer a product with any of the allowed values for such non-golden parameters. If buyer want to make any non-golden parameter a part of bid, he must select that parameter and select its allowed values while creating bid, else GeM system would presume that buyer has no specific choice for that parameter and will accept any value for that parameter. No bid can then be rejected for such non selected parameter.
It is also to be noted that the values of the reference product are no longer part of the bid and only allowed values will be part of bid. For Golden parameters, by default GeM would incorporate all values that are better than the reference product's values in the bid. Buyer can select and allow any more values that he feels appropriate so that the bid is as generic as possible to attract maximum competition. Similarly for Buyer chosen non-golden parameters also, reference product's value and better values would be allowed by default and Buyer can add more values of his choice.
Sellers would now need to mandatorily comply with complete Bid specifications to proceed with Bid participation. Since bidders will now be pre-filtered and allowed to offer only those products which are matching with allowed values of Golden as well as non-Golden parameters (Buyer selected), there would now be no need for Buyer's to check or reject any bid on the ground of specification mis-match as far as GeM catalogues are concerned.
Incident management policy has been revised, please click here to view the new policy.
As per the OM issued by the Department of Expenditure, Ministry of Finance (No.F.6/18/2019.PPD), the following provisions have been enabled on GeM -
Proof of Delivery Submission
The system would not allow the seller to generate an invoice, if the delivery period of an order has passed. The sellers must also submit the proof of their delivery to the consignee's location before the delivery date of the orders has passed, for their shipments to be eligible for Auto PRC and Auto CRAC
Auto PRC and Auto CRAC
Auto PRC
In case if the seller has submitted the proof of delivery before the order's delivery date has passed, their shipments would be eligible for auto PRC. This means that if the consignee does not generate the PRC within 4 days from the date of delivery as per the proof of delivery submitted by the seller, then the system would generate an auto PRC, marking all the shipped quantities as PRC accepted. At this point, the consignee would have 2 more days to make any modifications. In case, if still no action has been taken by the consignee within these 2 days, then this system generated auto PRC would be considered as the final PRC which could no longer be modified.
Auto CRAC
In case if the seller has submitted the proof of delivery before the order's delivery date has passed and the final PRC is also completed (through the system or by the consignee), then their shipments would be eligible for auto CRAC. This means that if the consignee has not generated the CRAC within 10 days from the date of delivery as per the proof of delivery submitted by the seller, then the system would generate an auto CRAC, marking all the PRC quantities as CRAC accepted. At this point, the consignee would have 3 more days to make any modifications. In case, if still no action has been taken by the consignee within these 3 days, then this system generated auto CRAC would be considered as the final CRAC which could no longer be modified.
Supplementary Invoice
For product orders where the consignee has made some rejections at the PRC or CRAC stage, the sellers would now have an option to issue a supplementary invoice against these rejected quantities. This option would be available to the seller before the delivery date of the order has passed.
For more information on the OM, please click here.
Type and Size of Prefab Shelter | Type A-6 Outside size 7.620 M x 13.271 M with PUF Insulated Panel of 80 mm including Full length Verandah and attached Toilets |
Structure of Shelter (Common drawing) | As per layout drawings conforming to GeM Drg. No. 1 to Drg. No. 12 and Perspective view of roof with arrangement of Purlins and Columns for shelter - Floor structure - Steel footings - roof - doors - windows - Ventilators - Base frame - Floor panels with constructional details of the main structural members - as per GeM drg. uploaded at QR SPCN DOCUMENT |
Desing / Drawing of TYPE A-6 | As per GeM DRAWING DOCUMENT uploaded. |
Scope of supply (Offer Price to include all cost components) | Supply - Installation - Testing and Commissioning of Prefab Shelter - including Electrical wiring & Fittings as well as Plumbing and Sanitary fittings - As per Drawing uploaded at QR/Spcn document. |
Transpotations / Freight charges | Offer Prices are on Free Delivery at Consignee site basis. |
Approval of Advance sample before Bulk Supply | After award of contract - Seller shall have to get Advance sample approved from Buyer before manufacturing / starting Bulk supplies - Buyer shall approve / provide list of modifications required within 10 days of offer of advance sample - If there is delay in approval of advance sample from Buyer side - the delivery period shall be regularized for the period of delay in sample approval. |
Foundation for Prefab Shelter | No Foundation required - can be erected on any flat surface |
Time Period for Completion of Erection work at site by Seller | Within 45 days of the date of receipt of consignee's confirmation regarding Readiness of site for erection |
Payment Terms | Bill / invoice to be submitted in two parts by seller (80% and 20%). Payment for initial 80% to be made within ten (10) days of receipt of goods by consignee. Bill for balance 20% to be raised by seller after completion of installation / commissioning , and to be released by Buyer with in ten (10) days of issue of consignee receipt-cum-acceptance certificate after Successful installation / Commissioning |
Suitability / structural stability / completness of structures, the structure is intended for use in | Design condition 80 mm Design thickness - In wind condition of 55m/s - in Seismic zone V and ambient temperature range (-) 40 degree C to (+) 50 degree C - 1 M snow load standing on the roof - Roof slope 1 : 2 Shelter should be structurally stable and suitable to meet severity of these climatic condition. |
Structural Design | Confmg. to IS : 875 / latest for structural design - steel used Confmg. to IS : 2062 / latest - Steel sections Confmg. to IS : 4923 (latest) |
Number of Trusses | 6 nos. Confmg. to the relevant drawing |
Thickness of False Ceiling and Partition | 40 mm thick panel |
Other Dimensions and tolerances | Confmg. to the relevant drawing - tolerances in Length of members and overall dimensions ± 25mm upto 3mtrs dimensions - ± 40mm on 3mtrs to 6mtrs dimensions and ± 50mm on 6mtrs and above dimensions - All steel and other sections have to be rolling tolerances. |
Structural members | To be welded together unless specified otherwise the relevant drawing. |
Prepainted galvanized steel (PPGI) sheet | Confmg. to IS : 14246 / latest |
For Roof and Flashing on roof | Trapezoidal corrugation Design sheet of 0.6 mm thick (TMT) |
All panels, Joint angles, Tracks and Flashing | Ribbed type Design sheet of 0.5 mm thick (TMT) |
Zinc coating | Have minimum 120 gsm of zinc coating on both sides followed by a top coat of PVDE / Silicon modified Polyester having a thickness of 20 micron minimum and with back coat of Polyester having thickness of 7 micron minimum. |
Scratches protection | Top finished surface of PPGI sheet to be covered with Guard film (Polyethylene) |
Colour of PPGI sheet | As per Buyer's choice |
Durability of Paint coat | Correspondent to Class - 1 as per Table - 1 of IS : 14246/latest |
Polyurethane Foam (PUF) insulation | Encased between pre-painted galvanized steel sheets |
Puf components | iso-cyanide and polyol liquid for in-situ process of providing polyurethane foam insulation in the panels. |
Bulk density of PUF insulation | 40 Kg / Cum. ± 2 Kg / Cum.and Confmg. to PUR 1 Grade of IS : 12436 / latest |
Puf machines | High pressure dispensing machine of required capacity |
Insulation of Wall, Roof and Floor panels | Insulation core of panel to be formed in one piece and provides desired structural and physical properties |
Injection of PUF chemical mixture | To be ensured injected in to the cavity before the foam reaction starts - To be injected specified amount into the cavity of full panel in one shot (in case of wall and roof) and in three shots in case of (Floor panel) in a duration not exceeding 25 seconds. |
PU foam layer | 79 mm in case of 80 mm wall panels design. |
Finish and Bonding | Panel to be assembled with all the components in a hydraulic press between heated aluminium platens. |
Steel Footing made of | Steel section |
Bottom plate of Footing | 6 mm thick MS plate of size 600 mm x 600 mm |
Triangular stiffener | 8 Nos. of 5 mm thick MS plate of size 150 mm x 300 mm to be provided and welded to vertical plate. |
Vertical plates | 4 Nos. of size 300 mm x 300 mm x 5 mm to be provided and welded over the bottom plate. |
Number of ISA | 4 Nos. of size 50 mm x 50 mm x 6 mm thick 1200 mm long having slot for adjustment of height to be provided these ISA and be inforced by 40 mm x 4 mm MS flat at every 300 mm c / c |
Jointing of plate girder | MS plate of size 320 mm x 320 mm x 6 mm to be provided and welded on the top of these 4 nos. ISA 50 mm X 50 mm X 6 mm cleat to be used for jointing of plate girder 150 mm with footing with the help of suitable nut and bolts. |
Joining of Floor panel and base frame | Floor panel to be joined with the steel base frame with the help of 10 mm x 125 mm counter sunk nut bolt for 80 mm design. |
Steel footing to be welded | By means of MIG welding |
Fixing of Base Frame | Steel footings are fixed to each other with help of solid web built up I - Section having 3 mm thick MS Plate as web and 6 mm thick MS Plate as flanges in size 150 mm fixed to the steel footing with help of MS Angle of size 50 mm x 50 mm x 6 mm suitable nut and bolts. |
Joining of Floor panel | Insulated Floor panel to be joined with grid of steel base frame work with the help of 10 mm x 100 mm and 10 mm x 125 mm counter sunk nut bolts for 60 mm and 80 mm design respectively. |
Super structure consists of | Steel Framework of RHS (Rectangular hollow section) column of size 12 mm x 61 mm x 3.6 mm provided at a distance of 2.6 mtrs centre to centre |
Trusses manufactured | To be in split form (two parts) using RHS section of 80 mm x 40 mm x 3.2 mm at top and bottom cord of truss and 50 mm x 25 mm x 1.8 mm thick internal members. |
Trusses to be fixed | On to the columns with connection plates of 6 mm thick and tightened with help of nut and bolts. |
Purlins made up of | RHS of size 96 mm x 48 mm x 3.2 mm and to be fixed between the trusses with suitable cleats and nuts and bolts as per relevant drawing. |
Purlins provided | At verandah are made using RHS of size 96 mm x 48 mm x 3.2 mm and are fixed and flushed with top level of the truss extension member with help of 5 mm thick MS and plates and 10 mm nut bolts. |
Verandah width | 1.5 mtrs. |
Verandah column made | Using RHS section of size 80 mm x 40 mm x 3.2 mm thick fixed with help of 5 mm thick MS and Plates and 12 mm nut bolts at the top level on base plate of the steel footing. |
Design and dimensions | Steel structure for the shelters to be designed with dimensions as per the relevant Drawing. |
Panels provided with | Tongue and groove joint and to be interlocked using cam lock systems. |
Gable ends covered | With same panels as in the main walls. |
Wall panels at the corner | To be joined by PPGI corner angle. |
Top track | Wall panels to be have PPGI top track. |
Welding | No welding |
Bent / riveted | PPGI angle and flashings to be bent or/ and riveted to form the desired shapes and sizes. |
Floor to be made in | PUF panel system using 0.5 mm thick (TMT) PPGI as outer and 15 mm thick BWR ply as IS : 303 (latest) as inner skin with |
Gap filled with | Rigid CFC free polyurethane foam of Density 40 Kg/cum ± 2 Kg/cum as insulation with 2 nos. reinforcement hollow rectangular section of size 60 mm x 40 mm x 2 mm thick. |
Thickness of PU foam | 65 mm for 80 mm design and having 15 mm thick BWR ply |
Toungue and Groove joint | Floor panels have to be toungue and groove joint and having interlocked systems. |
Floor finish in Living area and verandah with | Laying and pasting of 2 mm thick heavy duty abrasion resistant PVC vinyl flooring with SR 707 rubber adhesive in the living area including verandah. |
Floor finish in Toilet | 6 mm thick antiskid ceramic tiles of size 300 mm x 300 mm to be fixed with help of 15 mm thick pure cement and tile adhesive mix over chicken wire mesh. |
Mesh fixing | Chicken wire mesh to be fixed on floor panel with help of steel screws |
Floor panel fixing | Floor panel to be fixed to base frame steel beams with help of counter sunk nut bolt of 10 mm dia and 100 mm long for 80 mm design. |
Joining of wall and floor panels | To be joined with wall floor angle made of PPGI - No welding allowed |
PPGI angle and Flashings | To be bent or / and riveted to form the desired shape and size as per relevant drawing. |
False ceiling to be provided | In main living area |
False ceiling to be made of | Panels with 0.5 mm thick (TMT) PPGI steel ribbed sheet cladding on both side rigid CFC free polyuretane foam of density 40 Kg/cum ± 2Kg/cum as insulation. |
Thickness of PU foam layer | 39 mm in case of 80 mm / 60 mm design. |
Tongue and groove | False ceiling panels have to be tongue and groove arrangement and to be interlocked using cam lock systems. |
To accomodate False ceiling | Steel shaped channel of requisite size to accomodate false ceiling panel of 40 mm thickness to be used to fix all around the wall panel and false ceiling panel for support |
Joining of false ceiling | By means of rivets at minimum distance of 200 mm on both faces. |
Flashing | Details as per drawing no. PUF 60 / 80mm / FD - Tendere to fix and cover all the joints using PPGI flashing. |
Facia | Footing to be covered with PUF insulated panels. |
Panel to be made of | 2 mm thick FRP sheets made out of 450 GSM stranded chops fibre of matching colour of the shade of PUF shelter on both side with a layer of rigid CFC free polyurethane foam of density 40Kg/cum ± 2Kg/cum as insulation. |
PU foam layer thickness | 76 mm in case of 80 mm design. |
Total Thickness | 80 millimeter |
Facia panel to be fixed on | To the frame work of steel footing and steel beams with suitable nut and bolts - To be embedded into the ground so to cover exposed gap between shelter & NGL. |
Roof to be provided | In two way slope. |
Roofing to be done | With 0.6 mm thick (TMT) PPGI corrugated sheet fixed on to the frame work of trusses and purlins using self tapping self drilling (STSD) screws with suitable washers. |
Roof-sheeting junction to be covered | using 0.6 mm thick PPGI ridge cover. |
Roof projection | Minimum of 400 mm from eaves walls and 300 mm at the gable end. |
Main door | Aluminium PUF Doors with shutter |
Toilet doors | Aluminium flush Doors with shutter |
Main door size | 1000 mm x 2050 mm |
Toilet door size | 750 mm x 2050 mm |
Main / Toilet door frame made up of | Suitable aluminium profile section |
Main / Toilet door shutter | To be of PUF panel fixed with aluminium lipping all round side. |
PUF panel for Main / Toilet door | 0.5 mm thick (TMT) PPGI steel ribbed sheet cladding on both sides with a layer of rigid CFC free polyurethane foam of density 40Kg/cum ± 2Kg/cum as insulation in between |
PU foam layer in main / toilet door | 39 mm thick for 80 mm design / 60 mm design. |
Total thickness of main / toilet door | 40 mm for both design. |
Number of tower bolts in main / toilet door | 2 nos. of size 200 mm long (from inside)made of Alminium |
Main / Toilet door sliding bolt | 1 nos. of size 300 mm long (from outside)made of Alminium |
Bow handle for main / toilet door | 1 no. of size 150mm to be provided on both in and out side of each shutter. |
Windows & Ventilators | Aluminium 3 - way sliding |
Window size | 995 mm x 995 mm with all fitments |
Ventilator size | 595 mm (height) x 750 mm (width) - as per New Ventilator drawing. |
Windows / Ventilators Frame and Shutter to be manufactured | Using suitable Aluminium profile Sections |
Windows / Ventilators Shutter | To be of Three leaves |
Two shutter leaves for windows & ventilator | To be provided with glazing of 8 mm thick in 80 mm design multi wall polycarbonate sheet |
Another one leaf to be provided for windows & ventilator | With fixed fly proofing using stainless steel mesh of 1.5 mm aperture |
Sunshades for all external windows and doors | Made out of PPGI sheets and angle iron frame of size 35 mm x 35 mm x 3 mm |
Size of sunshades projection | 450 mm and 300 mm wider than the width of opening. |
Interiors for doors and windows | 25 mm diameter mild steel powder colour coated fancy type drapery rod with fixing arrangements to be provided. |
Width of drapery rod | 450 mm longer than width of the door and windows. |
Verandah Glazing to be covered | In its entire length and height |
Verandah glazing to be provided | From column to column and to be fixed to the verandah columns. |
Each frame in between 2 verandah column | Consists of one aluminium sliding window having glazed shutter of 8 mm in 80 mm design polycarbonate sheet. |
Any other portion to be fixed | Using 8 mm for 80 mm design multi wall polycarbonate sheet - as per relevant drawing. |
Glazed verandah entry | To be from both side of the gable wall side of verandah. |
Layout of plumbing | To be as per relevant drawings - Minor modifications allowed (if required by purchaser) without any extra cost. |
Sanitary / Electrical fittings | As indicated in the relevant drawings. |
Electrical points | For lights - fans - 6 / 16A sockets - capacitor type fan regulators and gangway boxes to be provided as per drawings. |
Main switchboard | Comprising of SP / DP MCBs & electric light fittings as shown in the drawing to be provided |
Electrical wiring | Tenderers to be responsible for installation and completeness of the wiring as per drawing - Confmg. to IS : 694 / latest |
Capacitor type fan regulator | Conform to IS : 11037 / latest |
MCB / Switches / Sockets / Cables /Distribution boxes | To be ISI marked |
All conduits | To be round PVC 25 mm medium grade confmg. to IS : 9537 / latest |
Earthing | To be conform to IS : 3043 / latest - to be done as per Indian Electricity Rules |
Earthing Resistance | In any case not to be exceed 5 ohms at any point. |
Individual earthing & Area earthing | To be ensured with proper earthing pits duly covered incorporating suitable earthing plates. |
Test reports to be furnished to buyer's on demand | YES |
OEM of offered product is ISO 9001:2015 certified | Yes |
OEM of offered product is ISO 14001:2015 certified | No |
OEM of offered product is ISO 18001:2007 certified | No |
Warranty period in number of years | 1 |
Please select "Allowed Values" for different specifications for properly defining your product. You can select multiple values as "Allowed Values" against any parameter to allow more competition.