This will lead you to GeM website.
Some cases have been reported where bidders have claimed non receipt of prior intimation of RA start. In order to ensure that no prospective eligible bidder is left out due to non intimation on time, it has been decide that RA will henceforth start 24 hours after the buyer proceeds for the RA creation and initiated RA. RA Start date and End Date will be notified to both buyer and sellers.
GeM system maintenance activity is planned from 17/06/2023 9:00 PM until 18/06/2023 02:00 PM. While we will work towards avoiding any outages, the system may be unstable intermittently. As a preventive measure, you are requested to either prepone or postpone Bid related activities such as Bid creation, Evaluation, Seek Clarification, Reply Representation and Negotiations etc, to other dates as per your convenience. Also, you may like to avoid keeping Bid end date and Bid Opening dates on or near these dates if feasible.
Please find enclosed OM dated 28.04.2023 on revised format for Registration of bidders from countries sharing land border with India under Rule 144 (xi) for your kind information and necessary action.
Notification regarding Cyber Security Control matrix
Please note that insecure products, solutions, and services lead to exposure to threats and cyber security breaches which affects procuring entities. Assuring cyber security as a feature of products and services require ensuring cyber security compliances as a part of procurement This will also help in building a cyber-security culture. Building awareness in government agencies to adopt cyber security controls as part of the procurement of ICT products and services, as well as engaging industry to put cyber security control requirements into practise, is crucial for meeting the objective of ensuring cyber security.
It is noted that many times due to lack of awareness various clauses, provisions, and guidelines regarding cyber security requirements mandated by MeitY are not being incorporated while making procurements by buyer organisations. In order to give inputs to the procuring authorities regarding these aspects, Indian Computer Emergency Response Team (CERT-In) drafted a discussion paper regarding cyber security control matrix for the procurement of services and solutions by government organisations. The control matrix includes governance and policy, confidentiality, availability, regulatory complexity, audits and situational awareness, data security, application security, and network security. Discussion paper indicates the specification and requirements of different controls as well as indicative methods for verification for each control matrix. A copy of the discussion paper is enclosed herewith.
It may be noted that procuring entities may select and include appropriate and applicable controls from the control matrix indicated in the discussion paper as a part of their procurement of ICT services and solutions. Procuring entities may also consider adding additional specific controls as per their risk profile and scope of services.
It may also be noted that the adoption of cyber security controls by procuring entities in the procurement process may be kept voluntary (as best practises). However, after a year, based on the outcomes, learning control may be mandated as a part of all ICT-related procurement by government entities.
All buyer organization as well as seller/service providers are requested to note the above.
Push Button Procurement (PBP) functionality enhanced - No need for buyer to certify reasonableness of rates:
GeM has enhanced the Push button Procurement functionality enabled as per DoE OM number F.6/7/2022-PPD dated 11th January 2023. The new guidelines for PBP are as follow:
Please refer push button procurement Manual for detailed guidelines. The details of Categories enabled for PBP are available here.
Buyers are advised to comply the latest OM No.F.7/10/2021-PPD (1) dated 23.02.2023 issued by DoE for the restrictions under Rule 144(xi) of the General Financial Rules (GFRs), 2017 while procuring on GeM.
With reference to the clause 4, Section xiii, Sub-section 'm' of GeM GTC, it is to bring to your kind attention that the following categories of Sellers are exempted from furnishing Bid Security:
Note: No EMD to be taken from exempt category of sellers even by way of specific clauses mentioned in ATC / STC by the Buyers. Such clauses which are against the GeM GTC, will be treated as null and void.
Get immediate financing through TReDS to pay your MSMEs and show compliance with MSMED Act.
Benefits of TReDS:
How to avail benefits of TReDS?
Not registered with TReDS? Start registration NOW
With reference to the OM No.F.6/1/2023-PPD dated 06.01.2023, from Dept. of Expenditure, the minimum service charges for the commission based Manpower Outsourcing services has been revised to 3.85%. Procuring entities can also fix the service charges above 3.85% with proper justification on file, wherever required. However, such service charges should not exceed 7% in any case. It is also recommended to use the Least Cost Selection (LCS) especially in High Value Bids, the template for which can be assessed on this link.
DPIIT has issued OM P-45014/33/2021-BE-II (E-64737) dated December 20th, 2022 related to common examples of "Restrictive and discriminatory conditions against the local suppliers" and "Other conditions which make the bid non compliant to PPP-Mll Order''. Buyers are advised to comply with the same and ensure that their tenders are compliant with PPP-MII Order and don't include restrictive and discriminatory conditions against the local suppliers.
Single packet bid has been enabled on GeM and buyers can procure using it. In single packet bidding both technical and financial offerings are being opened simultaneously and buyers evaluate both financial and technical offers simultaneously and publish the evaluation results. Please refer to the user manual for details.
Additional disclaimer and recommendation for buyers for procurement of Drugs/Medicine through Custom/BOQ bids:
All Provisions of Drugs and Cosmetics Act, 1940 and Rules made there under as amended till date will always be applicable. This will include all notifications issued by Central Drugs Standard Control Organisation (CDSCO), Ministry of Health & Family Welfare (MoHFW) and Department of Pharmaceuticals (DOP), Ministry of Chemicals & Fertilizers from time to time in this regard.
The sellers are registered on GeM based on self-declaration of valid Drug License, product certification, test reports etc. However, buyers mandatorily check and validate the details at their end for all applicable licenses and certifications e.g., validity and authenticity/genuineness of drug license, product certification, manufacturer certification/licenses, test reports etc.
In case of custom/BOQ bid, it is recommended to take Notarized Undertaking from private drug manufacturers for necessary compliances. (attached format of "Notarized Undertaking")
Only manufacturers for particular drugs/medicine may be eligible to participate in the bid or quote for the drugs/medicine.
The service category “Healthcare Human Resource Outsourcing Service” has been merged with the other existing manpower outsourcing services which are Manpower Outsourcing Services - Minimum Wage and Manpower Outsourcing Services - Fixed Remuneration . Hence, it has been disabled from the market for all new bids. Buyers can hire the healthcare resources from these 2 manpower outsourcing service categories. There will be no impact on already published bids.
GeM has launched the Push button procurement functionality on experimental basis enabling buyer to buy upto 5 lakhs simplifying the procurement process and require minimal intervention from buyer. This is system driven procurement enabled for the limited 50 categories . This has been enabled vide DoE OM number F.6/7/2022-PPD dated 11th January 2023. The buyer may refer the push button procurement manual for further details. The details of categories enabled for PBP is available here. The key guidelines for PBP are as follow
Load Based Bidding
Bids are currently being evaluated on GeM based on the price quoted by the bidder at the time of bid participation. However, there are some use cases when the buyer publishes a bid and expects certain technical and commercial parameters to be used to evaluate the price, resulting in the evaluated price being different from the bidder's offered price.
To capture detailed technical and commercial parameters, GeM has added another feature whereby a buyer can declare the Technical and Commercial Loading Criteria for Bid Evaluation during Bid Creation itself, which will be printed for the bidders' reference in the Bid document.
The selection of the Techno Commercial for Bid Evaluation will be optional for the buyer and the same can be saved as "No," if buyer doesn’t wish to go with the same.
This will be used by the buyer for the limited categories available in the GeM marketplace.
Categories where Load based will be applicable - BIOMASS and types of pumps like HSD, Screw , Fuel, Petrol pump.
Bunching of predefined categories has been enabled now for bidding. Buyer can create bunch bid of items from same category. Buyer can also create bunch bid of items from different categories if such categories are enabled for bunching by GeM. If the item categories that you are trying to bunch are not enabled to be bunched together and you feel that these are items are having same Supplier / OEM base and are required to be bought together and bunching will not lead to restriction in competition, then you may please send an email request to GeM at request-bunch@gem.gov.in for enabling bunching of such categories. Please mention exact name of GeM categories that you are requesting for enabling bunching. Your request would be examined by GeM team and if it is found that such bunching would not lead to restrictive bidding, GeM would enable bunching of those categories. This is a one time exercise and once enabled, all buyers can bunch those categories in all their future bids. Custom and BoQ items are by default enabled to be bunched with other regular categories.
The option of acceptance/ rejection of Direct Purchase/ L1 orders will be discontinued on GeM from 29th July 22 onwards. All the orders placed on GeM shall be auto accepted unless the buyer is red flagged or the order is for a freight intensive item. Only in these cases, the sellers will get an option to Accept/ Reject the order. Even in these cases, the order shall be auto accepted in 5 days if no action is taken by the seller.
The functionality for the collection of interest amount on the delayed payments as per DoE OM No.F.6/18/2019-PPD dated 3rd July 2020 is being made live from 01st August 2022, which would be applicable on all CRAC issued/generated on or after 01st August 2022. If the payment is delayed beyond prescribed timelines, the buyer will be liable to deposit interest as per DoE OM. Interests due showing in the Buyer dashboards for older contracts are being reset to zero and all future interests would have to be paid using online functionality deployed on the GeM using the SBI payment gateway.
Please read DO from CEO GeM regarding misuse of Custom / BoQ based bids.
DP and L-1 purchase for multiple consignee is not allowed. Buyer can add multiple consignees during bid creation.
Bunching of the items has been disabled for Direct Purchase and L1 purchase. For ordering multiple items put the items in separate carts and proceed to checkout in each cart.
GeM is in process to phase out the use of OTP based on authentication process at various stages of procurement like bid floating, bid submissions, invoicing, CRAC generation, Bill process, payment etc. For seamless and hassle-free transition it is advised to get yourself registered for esign or DSC based authentication services and complete all associated formalities. The exact date of disablement of the OTP based authentication will be communicated in near future.
GeM is in a process of development of functionality to deal the statutory variations of contract like GST, VAT etc online. In meantime till such functionality is deployed buyers and sellers are advised to deal variation of taxes OFFLINE at their end with due verification and scrutiny as per enforced tax rates, contract clause and applicable guidelines of organization.
Direct RA is being disabled. Please use BID to RA in place of Direct RA.
Escalation of Tickets – Please raise a ticket while flagging any issue to GeM, it helps better tracking, monitoring, and faster resolution. Further it helps in escalating it to higher level if issue is not resolved within defined timeline. Now tickets can be escalated https://gem.gov.in/gemtickets/create to higher level.
Training for registration and bidding for buyers and sellers - GeM offers self-help trainings for buyers and sellers to register and procure services from the GeM portal without any external help. The link to access these training programs is https://gem.gov.in/training/training_module.
Input Tax Credit - Input Tax Credit and Reverse Charge Mechanism feature in BID has been implemented. Input Tax Credit is required by Buyers who are eligible for Input Tax Credit on GST and GST cess (wherever applicable) in their purchase. Since they get credit of GST therefore, they require financial evaluation of BID considering input tax credit (ITC) so that L1 evaluation is on Net landed Cost to the Buyer. There are three types of sellers in this case. One is regular GST registered seller, unregistered seller and seller registered under composition scheme. This functionality is for all goods and services except services on commission base.
Custom bid and BOQ Bid- GeM strongly recommend use of category based bids - Use of Custom Bid / BoQ bid is not allowed for items for which regular category is available on GeM. Buyer can use the features of Additional parameters also to suit its requirement. Any bid created under Custom / BoQ category shall be cancelled by GeM without any notice, if it is found that regular category is available on GeM for similar items.
Creation of secondary user under different primary user with same mail id: The secondary user registration using an existing email address should be allowed for all the roles - Buyer, Consignee and PAO/DDO.
GeM has revised its Transaction Charge policy. This can be accessed at here
Vaccines and Generic Drugs/Medicine categories - Categories of Vaccines required under the Universal Immunization Program (UIP) of MoHFW have been made live in consultation with them. The categories of TB medicines required under National TB program of MoHFW and other generic drugs/medicines have been made live.
Unlimited RA Auto Extensions - Now there is NO limit on number auto-extensions allowed in reverse auctions, GeM recommends use of unlimited auto extension for best price discovery.
Bid opening from 3 days instead of 10 days only for central Gov & Central CPSE buyers and not applicable on BOQ and custom bids.
BID Life cycle from system has been removed from the system for all types of bids/RA.
Technical evaluator: Evaluation can be based on Single/Multiple evaluator(s) or self, selection for Tender Committee (TC) option shall also be available
Re-blocking of funds - Buyers will now be able to block funds which they had not done at the time of order placement due to reasons like change of financial years etc.
New Functionalities on Services
L1 negotiation: Buyer now gets an option to negotiate with L1 discovered from the financial evaluation. In case service provider has uploaded the price breakup then service provider gets the option to upload revised price breakup after conducting their negotiations with the buyer.
MSE preference: If buyer has selected MSE preference in bid then buyer will get option to send price match request to MSE if Non MSE bidder is selected as L1 and MSE price quoted is within L1+X% (X as defined in bid) range. In case buyer has not opted for MSE preference then buyer needs to provide competent authority approval with detail of approving authority.
Minimum floor price: A new feature has made live to solve the above problem, minimum floor price feature is available for buyers to define the minimum floor price below which no service provider would be able to quote in bid. This feature will help buyers to get reasonable price offers in bids. This feature is available for all PSUs/CPSEs/State Buyers and MoD.
Online invoicing for services - In order to introduce end to end procurement on GeM Invoicing has been made live on GeM for service providers and buyers to streamline the complete process.
Invoice rejection by consignee - Once the invoice raised by service provider, consignee now has the feature to reject the invoice against some rejection reasons which will be visible to service provider. Based on the comments, service provider will be able to update the invoice and then submit again.
Provision to upload additional SLA and SOW and ATC - Buyer has provision to write or upload document files for all of above features which will further become part of bid document and contract document and service provider has to abide by that. The terms and condition, scope of work or SLA mentioned by buyer will supersede by default conditions mentioned in SLA of the service.
Price breakup - GeM has introduced the functionality where Buyer can request for Price Breakup, Format to be uploaded by buyer for the breakup of components on cost/price offered by Service Provider in the Bid. Format uploaded by buyer may be used by service provider as reference for providing financial breakup. L1 will be evaluated by system basis on lowest price offered. GeM restricts this document to be available only during financial evaluation step, buyer will be able to open this document after financial will be open.
Custom filter for buyer - GeM has introduced feature to choose “Others” option from the list of values of technical parameters in case desired parameter is not available. Buyer has to select “Intent of Buying” as “Bid” to enter the Customized Requirement.
GeM system maintenance activity is planned from 25/06/2022 9:00 PM until 26/06/2022 12:00 Noon. While we will work towards avoiding any outages, the system may be unstable intermittently. As a preventive measure, you are requested to either prepone or postpone Bid related activities such as Bid creation, Evaluation, Seek Clarification, Reply Representation and Negotiations etc, to other dates as per your convenience. Also, you may like to avoid keeping Bid end date and Bid Opening dates on or near these dates if feasible. Please note, during this period Buyers can access all previous and ongoing Bid/RA status and details from their panel.
Forward Auction is a new feature addition into GeM platform enabling integrated B2B (Business to Business) and B2C (Business to Customer) auction featuring pan India auctioneers and bidders. As a GeM registered buyer, user can create “Auction” to sell off goods/materials/immovable assets within GeM portal using Forward Auction application and can reach out pan India bidders at a larger scale. To know more, click here
Advanced Search- https://bidplus.gem.gov.in/advance-search
Please click here to view the service approval process flow.
"Buyer Selected Non-Golden Parameters are now mandatory Bid requirement” - Buyers can now choose both Golden and Non-Golden Parameters for defining the Bid Requirements. This will enable Buyers to impose a non-golden parameter as a mandatory specification for their Bids.
All Golden parameters of the category and only those non-Golden parameters which Buyer has selected while creating bid (with values as selected by the Buyer or better than that), will now form part of the overall item specifications in Bid and will be published in the Bid document. Please note that the Non-Golden Parameters which are not specifically selected by the Buyer will now be discarded from bid and will not be published in bid and Sellers can offer a product with any of the allowed values for such non-golden parameters. If buyer want to make any non-golden parameter a part of bid, he must select that parameter and select its allowed values while creating bid, else GeM system would presume that buyer has no specific choice for that parameter and will accept any value for that parameter. No bid can then be rejected for such non selected parameter.
It is also to be noted that the values of the reference product are no longer part of the bid and only allowed values will be part of bid. For Golden parameters, by default GeM would incorporate all values that are better than the reference product's values in the bid. Buyer can select and allow any more values that he feels appropriate so that the bid is as generic as possible to attract maximum competition. Similarly for Buyer chosen non-golden parameters also, reference product's value and better values would be allowed by default and Buyer can add more values of his choice.
Sellers would now need to mandatorily comply with complete Bid specifications to proceed with Bid participation. Since bidders will now be pre-filtered and allowed to offer only those products which are matching with allowed values of Golden as well as non-Golden parameters (Buyer selected), there would now be no need for Buyer's to check or reject any bid on the ground of specification mis-match as far as GeM catalogues are concerned.
Incident management policy has been revised, please click here to view the new policy.
As per the OM issued by the Department of Expenditure, Ministry of Finance (No.F.6/18/2019.PPD), the following provisions have been enabled on GeM -
Proof of Delivery Submission
The system would not allow the seller to generate an invoice, if the delivery period of an order has passed. The sellers must also submit the proof of their delivery to the consignee's location before the delivery date of the orders has passed, for their shipments to be eligible for Auto PRC and Auto CRAC
Auto PRC and Auto CRAC
Auto PRC
In case if the seller has submitted the proof of delivery before the order's delivery date has passed, their shipments would be eligible for auto PRC. This means that if the consignee does not generate the PRC within 4 days from the date of delivery as per the proof of delivery submitted by the seller, then the system would generate an auto PRC, marking all the shipped quantities as PRC accepted. At this point, the consignee would have 2 more days to make any modifications. In case, if still no action has been taken by the consignee within these 2 days, then this system generated auto PRC would be considered as the final PRC which could no longer be modified.
Auto CRAC
In case if the seller has submitted the proof of delivery before the order's delivery date has passed and the final PRC is also completed (through the system or by the consignee), then their shipments would be eligible for auto CRAC. This means that if the consignee has not generated the CRAC within 10 days from the date of delivery as per the proof of delivery submitted by the seller, then the system would generate an auto CRAC, marking all the PRC quantities as CRAC accepted. At this point, the consignee would have 3 more days to make any modifications. In case, if still no action has been taken by the consignee within these 3 days, then this system generated auto CRAC would be considered as the final CRAC which could no longer be modified.
Supplementary Invoice
For product orders where the consignee has made some rejections at the PRC or CRAC stage, the sellers would now have an option to issue a supplementary invoice against these rejected quantities. This option would be available to the seller before the delivery date of the order has passed.
For more information on the OM, please click here.
Power Generator installation configurations as defined in CPWD General Specifications for Electrical works - Part VII (DG Set) | Fixed (Power Generators are permanently installed)" |
Nominal Rated Capacity (kVA) | 380 |
No of Phase (Single Phase-3-5kVA) (Single Phase or Three Phase-5 & 7-5, 10,15, 20, 25, 30 & 40 kVA) (Three Phase-50 to 900 kVA) | Three Phase |
Make of Engine | CUMMINS |
Model Number of Engine | QSM15-G1 |
Capacity of Engine (cc) | 15000 |
Rated Engine Power (kWm) | 100 % of the required powered at STP(Standard Temperature Pressure) i.e equal to (Nominal Rated Capacity (KVA) of power generator + Any Auxilary power Consumption by the Power generator) x Power factor(0.8) / Alternator efficience |
Type of Engine cooling | Liquid Cooled |
Type of governer | Electronic |
Number of cylinders (nos) | 6 |
No of Strokes (nos) | 4 |
Rated RPM of Engine (RPM) | 1500 |
Fuel | High Speed Diesel (HSD) |
Overload capacity | Engine is capable of delivering an output of 10% in excess of rated KVA for a period of one hour in any period of 12 hours continous running |
Specific Fuel Consumption (gm/kWh) | 200 to 265 |
Starting voltage (volt) | 24 |
Salient Features of Engine | Turbo Charged Engine,Naturally aspirated engine,Direct injection Fuel System,CRDi Fuel System,cold start upto (-20 deg c ),No derating applicable upto 4500 above MSL of altitude at 25 degree celcius,Indirect injection (IDI) Fuel System,Ambient working temperature upto 55 degree celcius. |
Class of governer | A2 or better |
"Maximum Change of Speed as a Percentage of Rated Speed on suddenly taking-off the rated load(Transient) " | 15 |
"Maximum Recovery Time in Seconds on suddenly taking-off the rated load(Transient) " | 15 second |
Maximum Change of Speed as a Percentage of Rated Speed on suddenly taking-off the rated load(Permanent) | 5 |
"Maximum Change of Speed as a Percentage of Rated Speed On a change of load, both on and off, by all steps of 25 percent of the rated load (Transient) " | 4 |
"Maximum Recovery Time in Seconds on a change of load, both on and off, by all steps of 25 percent of the rated load(Transient) " | 5 second |
"Maximum Change of Speed as a Percentage of Rated Speed On a change of load, both on and off, by all steps of 25 percent of the rated load (Permanent) | 1.5 |
AC GENERATOR (ALTERNATOR) Make | STAMFORD |
AC GENERATOR (ALTERNATOR) model Number | HCI444E |
Alternator Voltage Rating | 415 Volt |
Rating of AC Generator (KVA) | 380 |
Power Factor of AC generator | 0.8 |
Efficiency at rated Power factor at 75% of full Load | 95 percent |
Conformity to Indian Standard (for Alternator) | Generally conforming to IS:13364 (Part-2) latest (Above 20 KVA) |
Type of alternator | Brushless |
Voltage Regulation Grade | VG 3 |
Alternator IP Rating | IP 23 |
Class of Insulation | H |
Salient features of Alternator | NA |
Control Panel | Manual Control Panel |
Control Panel Location | Outside the Canopy |
IP Rating of Control Panel | IP 53 |
Display meters in the control panel (with appropriate rating and accuracy class ) - inclusive in the scope of supply | Voltmeter,Ammeter,Frequency meter,Power Factor meter,Multifunctional Digital display meter (displaying Voltage, Current, Frequency, Power Factor) |
Other devices in the control panel (with appropriate rating) - inclusive in the scope of supply | Required switches and cutout,MCB,MCCB,Contactor,Circuit breaker,Battery charger,remote monitoring over internet with GSM modem. |
Displayed parameters/Features | Engine Speed,Lube oil pressure,Coolant/cylinder head Temperature,Engine running hours,Engine battery voltage,Engine Running status,Generator Voltage (Ph-Ph),Generator Voltage (Ph-N),Generator Current (R, Y, B),Generator apparent Power (kVA),Generator active Power (kW),Powerfactor,Frequency,Fuel level,Control supply Voltage |
Indicators | Low Lube oil pressure,High water / coolant / cylinder head temperature,Low fuel level,Over speed |
Audio Alarm | Low Lube oil pressure,High water / coolant / cylinder head temperature,Low fuel level,Over speed |
Acoustic Enclosure (inclusive in the scope of supply) | Yes, Power Generator supplied with Acoustic Enclosure |
Sheet Thickness(mm) | 1.6 |
Thickness of insulation | 28 millimeter |
Density of insulation (kg/cubic m) | 32 |
Noise level at 1 meter (dB) | 75 |
Fuel Tank Capacity | 715 liter |
Number of Fuel tank | 1 |
Fuel Tank Sheet Material Thickness(mm) | 2 |
Fuel Tank Fabricated Material | M.S Sheet |
Fuel Tank Features | Fuel Tank capacity is sufficient for 8 hrs of running at full load,NA for 990 liter |
Battery Type & Specification | "Low Maintenance free to IS: 14257 for high cranking performance" |
Battery capacity (Ah) | 95 |
No of batteries | 1 |
Salient Features of Power Generator | Glass window on Accoustic Enclosure in front of the Control Panel,Emergency Stop outside the Accoustic Enclosure |
Additional Features | NA |
Trailer | NA for Fixed/Skid Mounted Power Generator |
Pay load of the Trailer | 0 kilogram |
Number of Axlels | 0 |
Number of wheels | 'NA' for without trailer |
Wheel Tyre size | 0 inch |
Brakes | NA for Fixed/Skid Mounted Power Generator |
Trailer Complying to CMVR act and Regulation | NA for Fixed/Skid Mounted Power Generator |
Maximum permissible Speed of Trailer(Km/hr) | 0 |
Trailer unladen weight | 0 kilogram |
Trailer overall length | 0 millimeter |
Gross Towing Weight (including Power Generator) | 0 kilogram |
Salient Features of trailer | NA |
General Technical Requirements (GTR) / Commissioning(Part-1) | a) Power Generator shall be complete with Diesel Engine, Alternator and AMF/MANUAL Control Panel along with Acoustic Enclosure. Diesel engine and alternator shall be closely coupled or provided with flexible coupling and mounted on a base plate / M.S. frame of robust in construction. |
General Technical Requirements (GTR) / Commissioning(Part-2) | b) Anti-Vibration mountings shall be provided for complete Power Generator in case of flexible coupling. In case of direct coupling Anti-Vibration mountings shall be provided for the Engine as well as the alternator. |
General Technical Requirements (GTR) / Commissioning(Part-3) | c) Power Generator should have protection against under voltage, over voltage, under frequency, over frequency, low battery voltage, over current, earth-fault, short circuit, phase sequence change etc. |
General Technical Requirements (GTR) / Commissioning(Part-4) | d) Automatic Mains Failure (AMF) control panel, where applicable, shall be able to start up the Power Generator and transfer the load on to the Power Generator on mains failure without requiring any human intervention. Similarly on restoration of mains supply, it shall be able to transfer the load to mains supply and switch off the Power Generator automatically. |
General Technical Requirements (GTR) / Commissioning(Part-5) | e) Control Panel (Manual / AMF), where applicable, shall be equipped with suitable Voltmeter, Ammeter, Frequency meter, power factor meter (these items can be alternatively supplied in one multifunctional digital display meter), battery charger, indicators, various switches and cutout / MCB / MCCB / Contactor / Circuit breaker for the DG output of appropriate rating and accuracy class as per trade practice for better utility. |
General Technical Requirements (GTR) / Commissioning(Part-6) | f) Supply and installation of a change-over Switch / MCCB of suitable rating for Power Generator with manual control panel, where applicable, is inclusive in the scope of supply. |
General Technical Requirements (GTR) / Commissioning(Part-7) | g) Acoustic Enclosure shall be made of Pre-treated and Powder coated CRCA Sheet. The sheet shall be Pre-treated and Powder coated with weather-proof paint. The Acoustic Enclosure shall be vermin proof. The enclosure shall accommodate the (daily service) fuel tank of the Power Generator to make the system compact. |
General Technical Requirements (GTR) / Commissioning(Part-8) | h) Power Generators shall meet the requirements of Environmental (Protection) Rules 1986 as laid down by Min. of Environment & Forests read with GSR 371 (E) dated 17.5.2002,GSR 520(E)dated 1.7.2003 , No.448 (E)dated 12.07.2004 , GSR 771(E) dated 11.12.2013 GSR 232(E)dated 31.03.2014,Gazette Notification No.167 dated. 31.03.2014 and Gazette Notification No. 578 dated. 11.11.2014 in respect of noise and emission norms. The latest amendments to above GSRs shall be applicable as and when amended by Ministry of Environment and Forest. |
General Technical Requirements (GTR) / Commissioning(Part-9) | i) Standard set of tools consisting of a set of 3 spanners, one screw driver, one standard plier and one nose plier of appropriate size shall be provided along with each Power Generator. |
General Technical Requirements (GTR) / Commissioning(Part-10) | j) Supply of Fuel tank of suitable capacity, sufficient for minimum 8 hours running/990 liters(whichever is lower) the Power Generator, is inclusive in the scope of supply. Fuel Tank shall be complete with fuel piping (between fuel tank and diesel engine), valves, level indications and all standard accessories. MS pipes, heavy class of suitable dia conforming to IS 1239 (Part-1) - latest shall be used for fuel piping. |
General Technical Requirements (GTR) / Commissioning(Part-11) | Buyer's Responsibilities: i. Mains ACB for AMF operation shall be provided by the buyer for DG set rating above 600 KVA and above .For DG set other ratings seller shall provide mains and DG contactor/breaker, ii. Exhaust piping, extra civil work, distribution board shall be provided by the buyer. iii. Consumables such as filters, lube oil at the time of servicing during warranty period shall be provided by the buyer. iv. Obtaining necessary approvals, if any, is the responsibility of the buyer. |
Above General Technical Requirements (GTR) / Commissioning have been seen, read, understood and agreed to comply | Yes |
Installation | with installation - inclusive in the scope of supply |
Scope of installation for Diesel Generating Set when offered by the vendor - inclusive in the scope of supply(Part-1) | a) Installation of Power Generator when offered by the vendor is inclusive in the scope of supply and shall be done by the seller. The installation work of Power Generator and its constituent parts shall be generally conforming to CPWD General Specification for Electrical Works, Part - VII - latest. b) Foundation shall be constructed by the seller. Foundation shall be of PCC type with the ratio of 4:2:1. The length and breadth of the foundation shall be 300 mm more from the respective length and breadth of the Power Generator. The height of the foundation shall be 400 mm, i.e., 200 mm below and 200 mm above the ground level. All the materials / labour required for foundation work shall be supplied by the seller. |
Scope of installation for Diesel Generating Set when offered by the vendor - inclusive in the scope of supply(Part-2) | c) Supply, laying and termination of interconnecting power and control cable shall be done by the seller. The cable supplied shall be ISI marked heavy duty PVC insulated, armoured cable, with PVC outer Sheath of Type ST-2 (FR Grade, Category C1), with aluminium conductor having insulation of PVC compound type -C, suitable for rated voltage upto and including 1100 volts and conforming to IS: 1554 (Part-1) latest. For 3-Phase Power Generators, 3.5 core or higher core cables shall be used. Total length of the cable supplied by the seller shall be within 30 meters for each Power Generator with manual control panel and within 60 metres for each Power Generator with AMF control panel. The current rating of the cables shall be as indicated below: 2C, 6 Sq mm for Single Phase, 3.5 & 5.0 KVA 2C, 10 Sq mm for Single Phase, 7.5 & 10 KVA 2C, 25 Sq mm for Single Phase, 15 KVA 2C, 35 Sq mm for Single Phase, 20 KVA 2C, 70Sq mm for Single Phase, 25 KVA 2C, 95Sq mm for Single Phase, 30 KVA 2C, 120Sq mm for Single Phase, 40 KVA 4C, 4 Sq mm for Three Phase, |
Scope of installation for Diesel Generating Set when offered by the vendor - inclusive in the scope of supply(Part-3) | d) 10 KVA 4C, 6 Sq mm for Three Phase, 15 KVA 4C, 10 Sq mm for Three Phase, 20 & 25 KVA 4C, 16 Sq mm for Three Phase, 30 KVA 3.5C, 25 Sq mm for Three Phase, 40 KVA 3.5C, 35 Sq mm for Three Phase, 50 KVA 3.5C, 70 Sq mm for Three Phase, 62.5 & 75 KVA 3.5C, 95 Sq mm for Three Phase, 82.5 KVA 3.5C, 120 Sq mm for Three Phase, 100 KVA 3.5C, 185 Sq mm for Three Phase, 125 KVA 3.5C, 300 Sq mm for Three Phase, 160 KVA 3.5C, 2 Run of 120 Sq mm for Three Phase, 180 KVA 3.5C, 2 Run of 150 Sq mm for Three Phase, 200 KVA 3.5C, 2 Run of 185 Sq mm for Three Phase, 225 KVA 3.5C, 2 Run of 240 Sq mm for Three Phase, 250 & 275 KVA 3.5C, 3 Run of 185 Sq mm for Three Phase, 320 KVA 3.5C, 3 Run of 240 Sq mm for Three Phase, 380 & 400 KVA 3.5C, 4 Run of 240 Sq mm for Three Phase, 500, 600 & 750 KVA 3.5C, 6 Run of 240 Sq mm for Three Phase, 900 KVA |
Scope of installation for Diesel Generating Set when offered by the vendor - inclusive in the scope of supply(Part-4) | e) Construction of suitable earthing station and necessary connections shall be done by the seller. All the materials / labour required for construction of earthing station shall be supplied by the seller. The total number of earthing pits/stations shall be 4, i.e., 2 for neutral and 2 for body-earthing. Netutral earthing shall be done with copper Plate and Body earthing shall be done with G.I. plate / Copper. The consignee should choose installation site in such a way that the earthing stations can be made within 10 metres of the Power Generator. Earthing station shall be typically constructed as per prevalent standard practices and shall be generally conforming to CPWD General specification for Electrical Works, Part - VII & Part - I - latest. e) Installation of Fuel Tank including foundation / stand shall be done by the seller. f)The warranty is applicable upto specified value of month/hours whichever occurs first's. |
Above Scope of installation for Diesel Generating Set when offered by the vendor has been seen, read, understood and agreed to comply | Yes |
Warranty on Complete power genertor/DG Set | 24 month |
Warranty in running hours | 5000 hour |
Number of preventive maintenance visits offered in an year during warranty period (Supply of all consumables is the buyer's responsibilty)* | 2 |
Response Time to attend the complaint during Warranty | 5 day |
Time Duration for Repairing /Replace the defect during Warranty | 10 day |
Type of lab which carried out Test of Complete Product to prove the conformity of product as per specification | Certificates required as per CPCB,Govt Lab,NABL accredited lab,NA |
Test report Available for (Test/approval) | Type Approval Certificate for the specified rating of the Power Generator from any of the designated agency authorized by CPCB,COP Certificate for engine,Type test report and Endurance test report for Engine as per IS: 10001 latest / IS: 10002 latest,Type test report for Alternator as per IS:13364 (Part-1) latest / IS:13364 (Part-2) latest to prove conformity to the specifications |
Agree to provide all relevant documents Test Report/supporting document /reports etc to the buyer at the time of bidding or on demand | YES |